1 estimator in this trade.
What drives the price
| Factor | Options | Price effect |
|---|---|---|
| Shower type | Custom tile shower, Walk-in tile shower with frameless glass door | Price effect: ×1 to ×1.6 |
Price ranges by job
| Job | Low (per unit) | Typical | High |
|---|---|---|---|
| Vanity with top and sink, installed | Low $500 | Typical $1,500 | High $3,000 |
| Toilet, installed | Low $275 | Typical $450 | High $800 |
| Tile shower remodel (base, walls, valve and door) | Low $2,500 | Typical $6,000 | High $10,000 |
| Acrylic shower kit or prefab surround, installed (instead of a tile shower) | Low $800 | Typical $1,600 | High $3,000 |
| New bathtub, installed | Low $1,100 | Typical $1,500 | High $3,000 |
| Floor tile, installed (per sq ft) | Low $8.00/sq ft | Typical $14/sq ft | High $30/sq ft |
| Plumbing changes (moving a fixture or new supply and drain lines) | Low $1,500 | Typical $3,500 | High $5,545 |
| Demolition and haul-away of the existing bathroom (fixtures, tile, drywall) | Low $700 | Typical $1,450 | High $3,500 |
| Bathroom exhaust fan, new installation with venting | Low $250 | Typical $500 | High $950 |
| Light fixture, installed by an electrician (vanity bar, recessed or ceiling light) | Low $100 | Typical $200 | High $400 |
| Bathroom remodel permit (building, plumbing and electrical fees) | Low $200 | Typical $450 | High $1,000 |
| Painting the bathroom (walls, ceiling and trim, moisture-resistant paint) | Low $200 | Typical $400 | High $700 |
Read more about bathroom remodeling costs
Moving the toilet, sink or shower to a new spot means new supply and drain lines, which is often the difference between a mid-range and an expensive job. Floor tile is priced per square foot and changes a lot with the tile you pick.
The smaller lines add up too: tearing out the old bathroom and hauling it away, a properly vented exhaust fan, new light fixtures wired by an electrician, painting with moisture-resistant paint, and the building, plumbing and electrical permits most cities require. Ask contractors to price each of those as its own line, say which fixtures are included, and state whether the shower is tile or a kit, so you can compare quotes on the same scope.
The estimator on this page adds up the parts you select from published market data, with a low/typical/high range and labor adjusted to wages in your state. It cannot see hidden water damage behind the walls or under the floor, so keep a contingency on top of the result.
Frequently asked questions
How much does a tile shower remodel cost?
A tile shower remodel (base, walls, valve and door) is sourced at $2,500 to $10,000, with a typical $6,000. An acrylic kit or prefab surround is sourced at $800 to $3,000 instead.
What does a new vanity or toilet cost installed?
A vanity with top and sink is sourced at $500 to $3,000 installed (typical $1,500), and a toilet at $275 to $800 (typical $450).
How much does it cost to move bathroom plumbing?
Plumbing changes such as moving a fixture or adding supply and drain lines are sourced at $1,500 to $5,545, typically $3,500. Keeping fixtures where they are is one of the easiest ways to save.
What do bathroom floor tile and demolition cost?
Floor tile is sourced at $8 to $30 per square foot installed, typically $14. Demolition and haul-away of the old bathroom is sourced at $700 to $3,500 for the job.
Do I need a permit to remodel a bathroom?
Usually, once plumbing or electrical work is involved. Permit fees are sourced at $200 to $1,000, typically $450, and the plumbing and electrical work should be done by licensed trades.